File #: 21-107    Version: 1 Name: BC000024 - 4090 Otter Point Road
Type: Action Report Status: Agenda Ready
File created: 1/26/2021 In control: Juan De Fuca Land Use Committee
On agenda: 3/10/2021 Final action: 3/10/2021
Title: Building Conversion to Strata for Lot A, Section 11, Otter District, Plan 33095 - 4090 Otter Point Road
Attachments: 1. Staff Report, 2. Appendix A: Subject Property Map, 3. Appendix B: Proposed Survey Plan, 4. Appendix C: Scott Engineering Inc. Report, 5. Appendix D: Wellmaster Pumps & Water Systems Ltd. Report, 6. Appendix E: Complete Septic Solutions Report, 7. LUC Minutes
Title
Building Conversion to Strata for Lot A, Section 11, Otter District, Plan 33095 - 4090 Otter Point Road

Recommendation
The Land Use Committee recommends to the Capital Regional District Board:
1. That Building Conversion Strata BC000024, for Lot A, Section 11, Otter District, Plan 33095, to obtain individual title for two single-family dwellings as part of phase 1 of the Proposed Phased Building Strata shown on the Plan prepared by Summit Land Surveying, dated December 2, 2020, be approved subject to the following conditions::
i. Submission of a Qualified Professional's report to confirm that the existing dwelling substantially complies with the BC Building Code and describe the life expectancy and projected major increases in maintenance costs due to the condition of the building;
ii. Completion of a building permit for the existing dwelling;
iii. Completion of any building permits and development permits required for the existing accessory buildings;
iv. Submission of a Qualified Professional's report confirming completion of the improvements to the existing domestic groundwater as outlined in the report prepared by Wellmaster Pumps and Water Systems Ltd., dated July 19, 2020, and certifying that well complies with the Groundwater Protection Regulation;
v. Submission of proof of a potable water supply for the proposed dwelling;
vi. Confirmation that the subject property can accommodate a sewerage system or systems that meet the requirements of the Sewerage System Regulation, for proposed phased strata;
vii. Substantial completion of a second dwelling on the subject property, as confirmed by CRD Chief Building Inspector, to form part of phase 1 of the proposed phased building strata as identified on the survey prepared by Summit Land Surveying dated December 2, 2020;
vii. The submission of a final survey plan for endorsement by the General Manager, Planning & Protective Services Department.
(Voting Block A - JDF EA, Colwood, Langford (Blackwell), Metchos...

Click here for full text